Case Study

ROM 4 – Roy Hill Minesite

Roy Hill expanded its operations with a new Run of Mine (ROM) located to the east of Marble Bar Road in the vicinity of the Ginbata airport location, currently named ROM 4. The ROM 4 Project is a 40.5Mtpa facility which is planned to deliver first ore by January 2023 and to be in service until 2032.

FSC's Role

FSC was responsible for the complete installation of formwork, reo and concrete for the work including all foundations, footings, plinths, slabs including reinforcement steel, concrete, formwork, embedment, cast-in plates, hold down bolts and cages for Package 1 which included the following structures,

  • Crushing station foundation and slab,  
  • Intermediate module footings  
  • Driving sump 

Scope of works

  • Laying waterproof membranes if required,  
  • Placement of blinding concrete,  
  • Tying reinforcement,
  • Set structural bolts  
  • Formwork
  • Pouring of structural concrete,  
  • Vibrating, levelling, finishing, and curing to all concrete,  
  • Stripping and removal from site of all formworks after use,  
  • Finishes / patches to all surfaces if required,  
  • Protection of exposed threads of holding down points, 
  • All construction joints (baking rod & sealant)

$1.35

  • ClientClientWestforce (Roy Hill)
  • DurationDurationFeb 2022 – May 2022

Project Gallery